Wetmore, of the contracting firm of Cushing & Wetmore, christmas open house invitation wording San Francisco, gives the following figures relating to sidewalk work in that city. The foundations of cement walks in the residence district of San Francisco are 2½ ins. thick, made of christmas open ...
|
| 28.01.2012 Assurant renters insurance |
-- ------ ----- Total making concrete 14 $26.75 $7.64 assurant renters insurance Total for labor per 100 ft $12.76 Materials for 100 lin. 1.40 3.50 Sand 1.0 1.00 1.assurant renters insurance 00 Total for material per 100 ft $26.17 Total for material and labor per 100 ft. $38.93 This is the ...
|
| 11.01.2012 Pleasant hearth fireplace doors |
Six cars were used and the concrete was dumped by them directly into the forms; the fall from the track above being in some cases 40 ft. The hoists and shuttle car were operated by an 8½×12-in. Lambert derrick engine, the doors hearth pleasant fireplace boiler of which also supplied steam to the ...
|
| 10.01.2012 Tri merge credit report |
The forms for the abutment and wing walls and for the floor slab were then erected complete before any more concrete was placed. No carpenter was employed, every man on the job having been taught to take his certain place in the work, then, the forms being erected, every man had his particular ...
|
| 30.12.2011 Subletting in nyc |
It took three men two 8-hour subletting in nyc days to bend 46,000 lbs. Their wages were $2.50 each per day, making the cost of bending 0.03 ct. With wages at $2.50 per day the cost of shaping and placing the reinforcement per ton was as follows: Item. Bending rods $0.60 Shearing rods to lengths ...
|
| 21.12.2011 Sloped ceiling recessed lighting |
1.24 Proportion of cement to sand and gravel 1-6 Itemized Cost per Lineal Foot. Sand and gravel $0.42 Cement 2.44 Mixing and wheeling concrete 0.98 Labor placing concrete 0.47 Forms and templates 0.30 Metal fabric 0.39 Setting up forms 0.43 Finishing 0.09 Tools, general and superintendence 0.43 ...
|
| 12.11.2011 Arch realty ann arbor |
bars which extended the full length arch realty ann arbor of the form between lugs. The assembled form was collapsed by pulling up on the bars, thus lifting the bolts out of the slots. The inner mold is also made in three sections with strap hinges at two of the joints and at the third joint a ...
|
| 30.10.2011 Namaste charter school |
The concrete was tamped behind the brick lining as the latter was built up by the mason. Cost of single ring charter school namaste brick lining at sides: namaste charter school 2 masons at namaste charter school 70 cents per hour $1.20 1 man mixing mortar 2.25 1/3 time man lowering at $2.25 ...
|
| 30.10.2011 Sublease agreement california |
The force employed was: 7 men making concrete, at $1.75 $12.25 sublease agreement california 1 man plastering the center 1.75 sublease agreement california 1 man mixing mortar 2.00 1 man tamping 1.75 ----- $17.75 On straight arch work they placed 24.1 cu. In three days' work on a curve, the same ...
|